- Current Projects
-
Marine Purification Pontoon
Research Title: Marine Purification Pontoon: Bioceramic Membrane Development
Ordering Agency: Ministry of Science, ICT and Future Planning
Research Term: 2013.10 - 2018.07


-
Low girder depth integral bridge
Research Title: Low Girder Depth Integral Bridge using Segmented Girder with High Strength Concrete and Piles
Ordering Agency: Ministry of Land, Infrastructure and Transport
Research Term: 2014.10 - 2016.10



- Research Achievements

Marine Purification Pontoon





Low girder depth integral bridge






Research Title | Ordering Agency | Research Term | Research Details |
---|---|---|---|
Mountainous region road line design & advanced Korean rest area technology development | Ministry of Land, Infrastructure and Transport | 2005.11.30 ~ 2010.08.29 |
- Suggest road line design plans suitable for Korean mountain regions - Advanced Korean rest area model development and design plan suggestion |
Functional improvement construction research of cement concrete pavement with considerations to structural function | Ministry of Land, Infrastructure and Transport | 2006.12.15~ 2009.12.16 |
- Construction joint fracture inducing device and construction method development - Proper construction joint distance for life extension and optimal performance - Membrane use standard suggestion |
Enhanced PSC BEAM application plan | DaeJon Regional Construction and Management Administration | 2007.09.10 ~ 2008.06.30 |
- Improved PSC Beam development which may be appliedto a maximum distance of 3.3m with considerations to theinner width of lanes of national highway and expressways |
On-site measurement monitoring system construction (Road antifreezing layer effectiveness verification and installation standard research) | Ministry of Land, Infrastructure and Transport | 2008.07.30 ~ 2012.08.07 |
- Construction of on-site measuring system for low embankment (less than 2m) sections - On-site measurement data DB construction and analysis - Research on continuous monitoring method of on-site measurement data |
Key 1. SMART Highway road foundation facility/road structure durability assurance technology development | Ministry of Land, Infrastructure and Transport | 2008.09.11 ~ 2013.07.10 |
- Design and construction standard improvement of access/buffer/interior reinforced slab |
Key 4. SMART Highway construction & facility standard and test bed construction/SMART Highway implementation plan research and test bed construction | Ministry of Land, Infrastructure and Transport | 2008.09.11 ~ 2013.07.10 |
- SMART highway project model commercialization type suggestion and service package plan research - Development of Transportation service for futuristic and advanced road |
Wireless conference system allowingtwo-way information exchange on a Wi-Fi network | Small and Medium Business Administration | 2009.06.01 ~ 2010.05.31 |
- Development of wireless conference system allowing up to 30 participants with central controller and personal station on Wi-Fi network |
Road landscape design technology development | Ministry of Land, Infrastructure and Transport | 2010.09.15 ~ 2011.09.14 |
- Development of road landscape design method and core facility design type with considerations to scenery and design |
Slim shield tunnel design technology development and design guideline proposal | Ministry of Land, Infrastructure and Transport | 2012.05.29 ~ 2015.05.28 |
- Drainage concept applied drainage hole resulting in 10-20% slimmer segments - 20% manufacturing price and 10% tunnel construction cost reduction, 20% reduction in CO2 production |
Carbon reduction type soil improvement technology development (Carbon-neutral road technology development) | Ministry of Land, Infrastructure and Transport | 2012.06.28 ~ 2013.04.27 |
- Soil improvement material review |
Standardization and manufacturing technology development of end girder depth increasing type pretensioned girder with movable reaction bed and debonding | Ministry of Land, Infrastructure and Transport | 2012.08.31 ~ 2014.07.31 |
- Improved appearance pretensioned girder cross- section standardization - Production and quality management technology acquisition - 10-20% economical improvement over existing PSC girder |