Technology Innovate Makes Better than Today 핵심기술개발로 더 나은 미래를 만들어갑니다.

  • Current Projects
  • Marine Purification Pontoon

  • Research Title: Marine Purification Pontoon: Bioceramic Membrane Development
  • Ordering Agency: Ministry of Science, ICT and Future Planning
  • Research Term: 2013.10 - 2018.07
  • Low girder depth integral bridge

  • Research Title: Low Girder Depth Integral Bridge using Segmented Girder with High Strength Concrete and Piles
  • Ordering Agency: Ministry of Land, Infrastructure and Transport
  • Research Term: 2014.10 - 2016.10
  • Research Achievements
Research Title Ordering Agency Research Term Research Details
Mountainous region road line design & advanced Korean rest area technology development Ministry of Land, Infrastructure and Transport 2005.11.30 ~
2010.08.29   
-  Suggest road line design plans suitable for Korean
mountain regions
-  Advanced Korean rest area model development and
design plan suggestion
Functional improvement construction research of cement concrete pavement with considerations to structural function Ministry of Land, Infrastructure and Transport 2006.12.15~
2009.12.16   
-  Construction joint fracture inducing device and
construction method development
-  Proper construction joint distance for life extension
and optimal performance
-  Membrane use standard suggestion
Enhanced PSC BEAM application plan DaeJon Regional Construction and Management Administration 2007.09.10 ~
2008.06.30   
-  Improved PSC Beam development which may be
appliedto a maximum distance of 3.3m with
considerations to theinner width of lanes of national
highway and expressways
On-site measurement monitoring system construction (Road antifreezing layer effectiveness verification and installation standard research) Ministry of Land, Infrastructure and Transport 2008.07.30 ~
2012.08.07   
-  Construction of on-site measuring system for low
embankment (less than 2m) sections
-  On-site measurement data DB construction and
analysis
-  Research on continuous monitoring method of
on-site measurement data
Key 1. SMART Highway road foundation facility/road structure durability assurance technology development Ministry of Land, Infrastructure and Transport 2008.09.11 ~
2013.07.10   
-  Design and construction standard improvement
of access/buffer/interior reinforced slab
Key 4. SMART Highway construction & facility standard and test bed construction/SMART Highway implementation plan research and test bed construction Ministry of Land, Infrastructure and Transport 2008.09.11 ~
2013.07.10   
-  SMART highway project model commercialization
type suggestion and service package plan research
-  Development of Transportation service for futuristic
and advanced road
Wireless conference system allowingtwo-way information exchange on a Wi-Fi network Small and Medium Business Administration 2009.06.01 ~
2010.05.31   
-  Development of wireless conference system allowing
up to 30 participants with central controller and
personal station on Wi-Fi network
Road landscape design technology development Ministry of Land, Infrastructure and Transport 2010.09.15 ~
2011.09.14   
-  Development of road landscape design method and
core facility design type with considerations to
scenery and design
Slim shield tunnel design technology development and design guideline proposal Ministry of Land, Infrastructure and Transport 2012.05.29 ~
2015.05.28   
-  Drainage concept applied drainage hole resulting in
10-20% slimmer segments
-  20% manufacturing price and 10% tunnel
construction cost reduction, 20% reduction in
CO2 production
Carbon reduction type soil improvement technology development (Carbon-neutral road technology development) Ministry of Land, Infrastructure and Transport 2012.06.28 ~
2013.04.27   
-  Soil improvement material review
Standardization and manufacturing technology development of end girder depth increasing type pretensioned girder with movable reaction bed and debonding Ministry of Land, Infrastructure and Transport 2012.08.31 ~
2014.07.31   
-  Improved appearance pretensioned girder cross-
section standardization
-  Production and quality management technology

acquisition
-  10-20% economical improvement over existing PSC
girder